Fifteen years of industry accumulation
Enable us to provide safer, more mature, and more reliable solutions
Service Process
Overall planning
01
Professional Design
02
Material selection
03
Professional installation
04
System delivery
05
01
Overall planning
Overall planning
Conduct on-site surveys, conduct comprehensive and systematic investigations and analyses, and provide detailed and reliable data for gas path design.

Key focus of on-site investigation:

1. Review the relevant layout, dimensions, and elevation civil construction drawings based on the overall plan, layer plan, and laboratory plan provided by the construction party;

2. Experience the spatial scale and relationship of the building and interior on site, check for any discrepancies with relevant control regulations, and find ways to avoid them;

3. During the on-site survey, the designer shall conduct necessary surveying and recording of the combination relationship and dimensions of key parts and components on site, providing raw data for the next design concept;

4. The measurement of dimensions is generally carried out from the park, building, facade, floor main door, to each room, in order from large to small.

02
Professional Design
Professional Design
Design a feasible centralized gas supply system based on the existing national control system and customer safety considerations, taking into account on-site conditions.

Firstly, it is necessary to collect basic information about the required project, especially the location of important gas cylinder rooms, the layout of pipelines, and the selection of design specifications and safety standards based on different gas properties; Then enter the specific design steps. When designing the gas cylinder room, priority should be given to considering the types of gases and categorizing them for design. Next, we need to consider the maximum designed gas consumption and choose different specifications based on different gas consumption. Combining relevant gas management regulations and fire safety management regulations. Calculate the design calculation sheet.

03
Material selection
Material selection
Gas control equipment - pressure relief device - valve - pipeline - filter - alarm device - junction box - regulating valve, etc

The laboratory gas installation system mainly consists of gas control equipment, pipeline and connection system, secondary pressure regulation system, gas filtration and purification system, gas alarm system, pressure gauge, terminal valve control box, etc.

04
專專業(yè)安裝
專專業(yè)安裝
15+years of construction team, certified to work, fast progress, delicate installation

1. The design of the steel cylinder room should be located on the main entrance side of the central laboratory, and shading and sun protection measures should be taken. When the steel cylinder room is integrated with the building, the partition wall should be a reinforced concrete explosion-proof wall.  

2. Good ventilation and sufficient explosion venting area, with fireproof flowers and anti-static measures on the indoor floor;  

3. Combustible gas cylinders (H2, C2H2) and combustion supporting gas cylinders (O2) should be arranged separately;  

4. A leak alarm system should also be established.


05
System delivery
System delivery
Professional after-sales team ensures the safe operation of equipment

Key points for laboratory gas path acceptance

1. Whether the quantity of components complies with the contract agreement.  

2. Are all connection points securely fixed.  

3. Is the pipeline layout reasonable and aesthetically pleasing.  

4. Is the gas header pasted correctly and beautifully.  

5. Is the pipeline connection correct.  

6. The entire system undergoes six tests including water, oxygen, particle size, helium leak detection, airtightness, and X-ray.

Advantages of Gesparker
Having been in the industry for a long time, the team has rich experience

The first batch of national high-tech enterprises specializing in special gas system engineering in China. We have our own special design institute and multiple industry design experts. The most efficient customized special gas system for customers. The special gas management system software with its own intellectual property rights can be programmed and customized according to user usage. There are multiple senior software engineers who efficiently tailor special gas management systems for customers.

Strong innovation ability to increase efficiency and reduce costs for customers

15 years of special gas experience, with numerous successful cases in various industries (please refer to the official website for details). We have the ability to design and manufacture our own special gas supply equipment, such as GC/GBBS/GR/VMB/VMP/Scruber, and have a 100 level purification production workshop. Special gas equipment, GC,GR,VMB, Especially with multiple national patents and software copyright patents held on the GMS system, the number of equipment patents is far ahead in the industry.

Establishing industry standards as the optimal partner for enterprise production

We have the ability to design and manufacture our own scrubber equipment (including control systems) and own patents. The special gas cabinet (GC) designed by Gasparker is equipped with an automatic high-pressure leak detection module, which maximizes the prevention of gas leakage safety accidents caused by bottle replacement and creates industry standards.

Emphasize technological innovation and strictly control construction safety

Gais Park regards safety as the lifeline and strictly controls every aspect. All construction personnel for each project are long-term employees of the company and have purchased company social security for more than 3 years. They do not lend project risks. Gesparker adheres to technology research and development and safety leadership, and has a user training school to provide users with the highest quality user training.